Posted Thursday, January 12th On Monday, January 16th the Female All Age Locker Room will be closed. We will also need to close the Whirlpool on Monday and Tuesday. The fire protection systems will be connected and workers will need access to those areas. We apologize for this inconvenience.
Posted Thursday, January 5th at 1:00 PM We will be installing new fire protection and sprinkler system and replacing the ceiling in the All-Age locker rooms over the next several weeks. To eliminate disruption to those areas during the day, the work and clean up will be performed at night when the YMCA is closed. The ceiling will remain exposed during the installation period; however, this procedure will NOT disrupt use of the locker room during our normal operating hours. Posted Thursday, January 5th The Y will be installing two additional hot water tanks today, which will address all hot water problems. The installation will be completed by the end of the day.
You may experience some tepid water this morning if the number of people showering is full. We apologize if you experience this. Thank you for your patience. Posted Tuesday, December 20th As of 6:00PM on Tuesday, December 20th, consistent hot water is resumed in both adult locker rooms. We are extremely grateful for your patience and cooperation during this very important and difficult upgrade of the YMCA utilities. All of the newly installed gas-fired heating and cooling systems will result in greater energy efficiency for the Y, which will ultimately reduce our over-all energy cost and diminish our carbon footprint. On behalf of the entire staff and Board of Directors, thank you for your support! Sincerely, Pat Morrissey Executive Director
Posted Monday, December 19th
Posted Thursday, December 15th Once again I write with apologies for the inconveniences that you have experienced lately during this complicated conversion of our old oil-burning furnaces to new, gas-powered, energy-efficient/green technology. Had we known in advance that the installation of this utility would present such challenges; we might not have gone down this path. That said we’re almost there! As you read this, we have a small army of experts (engineers, plumbers, boiler technicians and electricians) working on the problem. They have discovered several inconsistencies within our old plumbing as it relates to the path of hot water and safety mixing valves – all hidden behind walls or in suspended ceilings. In short, the hot water generated by our new system is being negated by defective old plumbing, mixing/anti-scalding valves. These valves are being replaced (through the night tonight and tomorrow) with the goal to be fully functioning sometime Friday (Monday the latest). I hope that this helps you better understand the Y’s current hot water dilemma, and I want to assure you that these problems will soon be behind us. Thank you for you continued support during this difficult, yet very meaningful time for the YMCA. As always, please feel free to contact me anytime. Sincerely, Pat Morrissey
Posted Friday, December 2nd Installation of our NEW Natural Gas-Powered heating System will begin on Monday, December 5th. 3 of the 6 showers in both adult locker rooms will be temporarily out of order while the new heating system is installed. There should be sufficient hot water for everyone, however, please be mindful to limit the time that you normally shower so that everyone can take a hot shower. We apologize for any inconvenience that this may cause you. Posted Sunday, November 27th We will begin using our new entrance and front desk beginning Monday, November 28th. Look for the blue awning! Posted Tuesday, November 15th Phase Two of construction is scheduled to begin on Monday, November 28, 2011. During this time, there will be several changes:
We appreciate your patience as we manage through the construction process. Please know that we have done everything to ensure the safety of our members throughout this process. We have thoroughly researched and worked with a professional service to ensure the demolition poses no safety risk.
Posted Tuesday, November 1st Studio 2 will be closed on Wednesday, November 2nd from 7:30 AM - 1:00 PM for the final stages of the new roof installation. All classes will be held in the gym. The TRX Class will be cancelled. Posted Monday, October 31st On Tuesday, November 1st Studio 2 will be closed due to roof repair. All classes will be held in the Gym. The 9:30 - 10:15 AM TRX class will not be held. Update- Sunday, October 30th YMCA power has been restored. We will re-open on Monday, October 31st. Posted, Sunday, October 30th The YMCA is still without power. We've been in touch with CL&P and they hope to have the power restored by today. Once the power is back one, we hope to open our doors. Please check back for further updates. Posted Saturday, October 29th Due to the unexpected snow storm, the YMCA is without power and will be closed on Saturday, October 29th. Please call back on Sunday for updates. Posted Thursday, October 27th On Monday, October 31st Studio 2 will be closed due to room work. All classes, except for Light N' Easy, will be held in the gym. Light N' Easy will be held in the Wellness Center. Posted Monday, October 24th Studio 1 will be closed on Tuesday, October 25th. Studio 2 will be open.
Update to Friday, October 21st post
Posted Friday, October 21st On Monday, October 24th Studio 1 will be closed and on Tuesday, October 25th Studio 2 will be closed. We will be replacing the room. All scheduled classes will be held in the gym. We apologize for any inconvenience.
Posted Wednesday, October 19th On Thursday, October 20th Studio 3 will be closed 7:30 AM - 8:05 AM and 1:30 PM - 5:45 PM.
Check back for further closings. Posted Thursday, October 13th- 10:35 AM The water has been restored to the YMCA. We apologize for any inconvenience this caused and appreciate your patience. Posted Thursday, October 13th Due to overnight construction, the Darien Y is without water. The YMCA is OPEN! We hope to have the water restored as soon as possible. We apologize for any inconvenience. Posted Friday, October 7th On Monday, October 10th contractors will begin minor excavation in the Y parking lot in order to expose and reconnect existing main water service lines to the YMCA. Although one of the parking bays adjacent to the new construction will not have full parking, this process will not interupt nursery school drop off, nor will it disrupt Y water use. Posted Sunday, October 1st The Board of Directors and Staff extend our sincere appreciation for your patience these past several weeks during this very critical and complicated phase of the building project. Weather notwithstanding, construction is can be loud and messy business, and we apologize for any inconvenience this may have caused you.
We have made significant progress over the summer and are pleased to inform you that the first phase of our project is almost complete. In addition, we anticipate many fewer problems and unforeseen building issues in the upcoming Phase II of the project, which will include demolition and rebuilding of the school wing and lobby. Our contractors have scheduled the demolition in early November. Prior to that, the lobby, offices and nursery school will be temporarily located in the new, soon to be the home of our gymnastics gym. We anticipate a smooth transition of spaces, but most importantly, no interruption to your programs and services. We will send out another communication to remind you as that date gets closer.
Please note: In order to keep you better informed of our progress, we have installed a building “Daily Project Update” tab on our website: http://www.darien-ymca.org/index.php?option=com_content&view=article&id=205&Itemid=206 We strongly recommend that you to visit this tab frequently for the most current building news and updates. Please note the following:
On Thursday, October 6th, and Friday, Oct 7th, Exercise Studio I. will be closed. The following regularly scheduled classes, however, will be conducted in the Y gymnasium: Thursday Yoga (6:30 am) Pilates (8:15 am) Yoga (9:15 am) Yoga (11:00 am) Yoga (12:30 pm) Yoga (6:00 pm) Friday Yoga (8:00 am) Yoga (11:30 am) Yoga (1:30 pm) Yoga (5:30 pm)
Please also note that the Pancake PowWow, Halloween Party and our annual winter Flu shot vaccination will, regrettably, not be scheduled in 2011. |
|